Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 27 - Sep 1
Reserve from the case
Ships within 48 hours · Estimated delivery Aug 27 - Sep 1
it is recommended that you inspect all strainer closures prior to putting the strainer into service
and operates on 115 Volts with a 30-300 GPM
This is a Schedule 80 Van Stone Flange with a 3/4 inch slip connection
They have stainless steel treads
#1 Pump Tube Assemblies - Santoprene - Package of 50 ad-label_Replacement Parts it is recommended that youThis is a bulk package of 50 #1 Stenner Santoprene replacement chemical pump tube assemblies. Fifty replacement tubes and standard 1 4 inch ferrules are included with this item. The tube works with Stenner 45, 85, 100, 170, S30, S34, S3F, S3P, and S3V pumps.
US$ 7994.50
US$ 51.95
Pay in 4 interest-free payments of $77.00 Learn more