Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Sep 10 - Sep 15
Reserve from the case
Ships within 48 hours · Estimated delivery Sep 10 - Sep 15
- Structure: Galvanized steel
Cane-line Cut Stacking bar Stool (11402)
Main item material: Hot-dip galvanized sheet steel
requiring assembly (assembly instructions included)
Glatz M4 Cache pour douille M4 Collection_Meubles en teck classique Zebra classique - Structure: Galvanized steelGlatz M4 Cover for M4 concrete socket. For recent models. With 2 holes approx. 8mm diameter. Distance between holes approx. 12. 8cm (center to center). Supplied without socket and screws. The old Glatz m4 sockets had 3 holes for 3 screws. This 2 hole version is not compatible. If this item is not currently in stock at our warehouse in the chosen finish, the delivery time for " available to order " items from the QUICK SHIPPING range is 10 15 days. The
US$ 1274.50
US$ 1399.50
US$ 1049.50
US$ 774.50
US$ 974.50
US$ 1174.50
US$ 674.50
US$ 399.50
US$ 374.50
US$ 374.50
US$ 424.50
US$ 1099.50
US$ 699.50
US$ 2299.50
US$ 774.50
Pay in 4 interest-free payments of $6.00 Learn more