Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Sep 12 - Sep 17
Reserve from the case
Ships within 48 hours · Estimated delivery Sep 12 - Sep 17
increase fuel efficiency (4L fuel tank will last 6hrs) and reduce emissions
¥ Sanding sleeve for Model No
a pack of 36 ABS welding rods and a concise instruction manual
8mm Butt connector
Drum Trolley/Stillage 205L Air Hammers increase fuel efficiency (4L fuelHeavy duty tubular steel construction drum trolley. Ideal for moving 205L drums easily and safely. Features spring loaded mechanism ensuring stability and control whilst under load. Fitted with four wheels for moving easily over uneven surfaces. Features bracing strap to ensure load is secure. Unit can lay flat to enable use as a stillage. Model No. ST35
Pay in 4 interest-free payments of $16759.13 Learn more